Commercial

NewPath Tenant Improvements

NewPath Tenant Improvements

.

Location:  Morgan Hill

Year:  Completed in 2020

.

NewPath Landscape, an experienced and innovative landscape construction firm in Morgan Hill California, was looking to expand their office and create a new and refreshing space that represented their creative energy. 

WMA provided interior architecture services to encourage incorporation of the company’s theme/mission and encourage a unique working environment. The fresh new details express the energy and growth of the company. 

Gino Borello, Vice President: “Weston Miles was very thorough and thoughtful through the entire design process. They made the design phase enjoyable. Their design exceeded our expectations and we are ecstatic over the finished product.”

 

The Granary Expansion

The Granary Expansion

.

Location:  Morgan Hill, CA

Year:  Completed in 2020

Budget: $900,000

.

The Granary Expansion is a two story commercial building project located next to the Granary Building on Depot Street in Morgan Hill.

Realm Flower Co.

Realm Flower Co.

.

Location:  Morgan Hill, CA

Year:  Completed in 2018

Budget: __

 

 

.

New design for a small flower and gift shop.

All Sensors Building Expansion

All Sensor Building Expansion designed by WMA

 

Solis Winery

A new tasting room was designed that reflects a style similar to the existing older buildings. Small elements from the existing craftsman house were brought into the design of the tasting room.  This style accommodates larger windows that make an inside/outside connection and bring the grape vines, just outside the tasting room, into the experience.

Silicon Valley Glass

Silicon Valley Glass

.

Location:  Morgan Hill, CA

Year:  Completed in 2018

Budget: $480,000

.

Remodel of existing office space including new offices, conference room, break room and work area. A great opportunity to work with Silicon Valley Glass and incorporate a complete new look and feel. This project was Design build and completed on time and on budget.

Pono Wellness Spa

Pono Wellness Spa

.

Location:  Morgan Hill, CA

Year:  Completed in 2018

Budget: $300,000

.

WMA and Weston Construction provided turn-key design build for the new Pono Wellness Center tenant improvement including 2 saunas, several private massage rooms, private jetted tub rooms, and locker rooms for guests. Working hand in hand with Bonni Kelly, the owner and a collector of all things Hawaiian, the end result is a relaxing environment to get you in the mood for some well-deserved pampering.

Running Shop & Hops – Granary District

Running Shop & Hops – Granary District

.

Location:  Morgan Hill, CA

Year:  Completed in 2016

Budget: $200,000

.

The Running Shop and Hops is located in The Granary just steps away from the WMA office. We converted the one time storage space into the perfect hybrid of running shop and beer bar. The Running Shop and Hops has become the new go to spot in town and a hub for local runners. As put by the owners, “We created this place so that every type and level of fitness enthusiast could come here to share ideas, discuss training and ultimately fulfill their athletic endeavors.” Five o’clock never tasted so good!

Save

Granada Theater

Granada Theater

.

Location:  Morgan Hill, CA

Year:  Completed in 2016

.

The Historic Granada theater was built in 1940 in a modified moderne style. Constructed of masonry the building provided a place  for live theater as well as films in a wide open space. Over the years, in an effort to make it more viable, the theater space was divided into two spaces by a full height central wall creating two small theaters. The theater operated until 2005 when it was sold to a developer who left it vacant for 10 years..

The challenge in 2015 was to save this historic landmark that was slated for demolition in the downtown.

Next door to the theater was a shop that had operated as a cigar and wine shop. The two buildings were divided by a masonry wall. The design was challenging in the structural integration of the two spaces to create a full service theater, banquet space and associated bar and restaurant kitchen and the overall structural retrofit and accessibility design for the main hall space.

The interior floor was raised up to two feet in some areas to meet accessibility and the restrooms were redesigned to accommodate accessibility while retaining some of the original quirky layout. A fun and challenging project, we are thankful that Frank Leal purchased the building and went all in on the redesign and retrofit as well as keeping a renovated GRANADA sign and the wonderful curved entry at the transition to the sidewalk as well as enhancing the lobby.

Save

Save